The proposed DfMA solution increases time-savings for construction projects of all scales. During the design stage of a project, the project manager would plan the progression of the construction works. Using prefabricated walls can increase time savings as their manufacturing and assembly can be completed in concurrency with site preparations (Figure 7).  In addition, the workers do not need time to make adjustments to the AAC walls for pipings, M&E, and architectural finishes, as allocations for these fittings and finishes would have been accommodated during the design phase and completed during the manufacturing phase. This would allow an expeditious transition from one stage of construction work to another, increasing the time-saving of the project.